Dirt work, land clearing and road building around Fort Worth, TexasDirt work and land clearing in Fort Worth
Bankston's Builders
Aerial view of cleared lanes cut through a large cedar tract, land clearing
Our Services

Land Clearing in Fort Worth, TX

Land Clearing · Fort Worth, TX

Raw land cleared and ready for the next phase

Bankston's Builders offers land clearing services for jobs that call for heavy equipment. We take trees and brush off ranch land, commercial sites, oilfield locations and road corridors. Excavators and dozers do the clearing, and grubbing pulls the roots out of the ground.

Land clearing is often the first phase of a bigger dirt-work job. Once the ground is open, the tract can go straight into site preparation for a building pad. A cleared corridor starts a ranch road or a lease road, and our road building takes it from there. Our service area centers on Fort Worth and reaches the Permian Basin and the Texas Hill Country.

What We Handle

  • Clearing trees and brush off raw tracts with excavators and dozers
  • Grubbing stumps and root crowns out of the ground
  • Mesquite grubbed out below the bud zone, where new sprouts start
  • Ranch clearing for pasture and ranch improvements
  • Pad site clearing ahead of commercial and data center builds
  • Clearing for oilfield locations and lease roads in West Texas
  • Road corridor clearing for ranch roads and access roads
  • A written quote with the clearing scope spelled out

Request a Land Clearing Quote

Tell us about the land or the building project and where it is. We look at the job and put the quote in writing.

Ranch Land Clearing West of Fort Worth

We do ranch clearing south and west of Fort Worth, out to the Texas Hill Country and West Texas. The further west the ranch, the bigger the clearing job tends to run.

Mesquite grows across most of Texas, and it fights back when it is cut. Its dormant buds sit on the underground stem, most of them 2 to 6 inches below the surface. Cut a mesquite at ground level and new sprouts come up from those buds. Grubbing pulls the root crown out below that zone, so the tree is much less likely to return.

With cedar, the species matters. Ashe juniper, the mountain cedar of the Edwards Plateau, does not sprout back from the stump. Redberry juniper, which has spread across the Rolling Plains of northwest Texas, sprouts again from buds at its base. Cutting off the top alone leaves those buds in the ground.

What Does a Land Clearing Contractor Do on a Big Tract?

The job starts with the scope: which ground gets cleared and which trees stay. On a building site, the site plan sets those lines. Inside Fort Worth city limits, the city's urban forestry rules also set how much tree canopy must remain.

Big clearing jobs start with a Texas 811 ticket. If a pipeline crosses a tract too big for one ticket, state rules call for a meeting with its operator. Then excavators and dozers take the trees down, and the roots get grubbed out.

The state extension service notes that moist soil lets the root crown come out more completely. When the clearing is done, land grading shapes the ground for drainage and the next phase.

Land Clearing Services for Pad Sites and Road Corridors

Commercial pads and data center campuses often start as raw land. We clear the footprint and the access routes first. That opens the ground for the rest of our dirt work in Fort Worth and across Texas.

Road corridors work the same way. A new ranch road or access road needs cleared, grubbed ground before any road base goes down.

On a building project, the state's construction stormwater permit covers work that disturbs one acre or more of soil. TCEQ runs that permit, and its website explains who needs coverage.

Excavator clearing brush and trees off a tract, land clearing Dozer clearing brush under a large oak tree, land clearing

Ready to get started?

Call or text for a written quote. We work about 300 miles around Fort Worth across DFW, West Texas and the Hill Country.

(214) 557-5106
How We Work

How a Job With Bankston's Builders Runs

From the first call or text to the finished work, here is how it goes.

1

Call or Text

Call or text (214) 557-5106, or send the form. Tell us what the project is, where the land or the building sits and when you need it done.

2

We Look at the Job

We go over the tract or the space, the plans and the access for heavy equipment. On dirt work we also look at the ground and where the water runs.

3

The Quote in Writing

The scope and the price go in writing before any work starts. The quote spells out what gets cleared, cut, built or finished.

4

Equipment Moves In

Machines and crews come in on the set date. On a dirt job the work runs in order: clearing, the pad or the road, the trenches, then the drainage. On a build, the trades follow the schedule.

5

Finished and Ready for What Comes Next

The ground is left graded and compacted to the plan, ready for concrete, a building or a rig. On a finish out or a custom home, the work runs through to the finished space.

FAQ

Land Clearing Questions, Answered

Common questions about land clearing around Fort Worth and the rest of our Texas service area. If yours is not here, call or text and ask.

Call (214) 557-5106

How much does land clearing cost?
Most of the price comes from the acreage and how thick the brush is. Tree size, rock, slope and grubbing depth move it too. Moving heavy equipment to the site is part of the cost, and a bigger tract spreads it over more acres. We look at the tract and put the quote in writing, with the plan for the cleared material spelled out.
Do I need a permit to clear land in Fort Worth?
Inside Fort Worth city limits, often yes: the city's urban forestry rules cover clearing all or part of a property. Removing a post oak or blackjack oak 18 inches across or larger takes a permit from the urban forestry administrator. The Urban Forestry Management section of Development Services answers the question for a given tract. Other cities set their own rules, so each city's permit office is the place to ask.
Do I need to call 811 before land clearing?
Texas law requires a call to 811 at least 48 hours before most machine digging 16 inches or deeper. Weekends and legal holidays do not count toward those hours. Pulling trees and grubbing roots can reach that depth, so big clearing jobs start with a ticket. The ticket does not mark private lines that serve only the owner, so the landowner points those out.
What is the difference between land clearing and forestry mulching?
Forestry mulching grinds brush where it stands, and it is a service we do not sell. Our land clearing takes the trees and brush off with excavators and dozers, then grubs out the roots. Grubbed ground can go on to a building pad or a road.
Do you clear land for oilfield locations and lease roads?
Yes. Clearing the pad site and the lease road route is part of our oilfield construction work. That work serves oil and gas operators in West Texas and the Permian Basin. The caliche pad and the road go down on the cleared ground.
What areas do you serve for land clearing?
Fort Worth sits at the center of our service area, which runs about 300 miles around it. That takes in the Dallas-Fort Worth area, towns like Weatherford and Stephenville, the Permian Basin and the Texas Hill Country. Call or text (214) 557-5106 to tell us where the tract is.
More From Bankston's Builders

Work That Pairs With Land Clearing

Padfoot roller and skid steer on a graded building pad, site preparation

Site Preparation

Building pads for commercial buildings, data centers, oilfield locations and custom homes. We cut and fill to the plan grades and compact each pad in lifts.

Learn More
Two dozers on freshly graded ground along a road, land grading

Land Grading

Land grading levels lots and tracts and shapes the ground so water runs off. We do rough grading and finish grading with heavy equipment for developers, ranch owners and oil and gas operators.

Learn More
Aerial view of new roads cut through cedar and cleared land, road building

Road Building

We build private, ranch, lease and haul roads on a compacted base with a gravel or caliche surface. Ditches and culverts move water off and under the road.

Learn More
Why Choose Bankston's Builders

Dirt Work and Construction Around Fort Worth

Heavy Equipment on Every Job

Excavators, dozers, compactors and skid steers do the work, run by crews with real expertise on each machine. The jobs are sized to match: multi-acre clearing, commercial pads, long roads and oilfield locations.

Dirt Work and the Build, One Company

The pad, the concrete and the building can all run through the same company. A custom home starts on a pad we cut and compacted. A commercial project can go from raw land to a finished tenant space.

Commercial, Oilfield, Data Center and Ranch Work

Developers, oil and gas operators, data center builders and ranch owners all bring us ground to move. Each site gets its own scope, whether that is a detention pond, a lease road or a campus pad.

The Quote Goes in Writing First

Tell us about the land or the building and where it sits. We look at the job, then put the scope and the price in writing before any work starts.

Guides and Resources

Land Clearing Guides

Request a Quote

Get In Touch With Bankston's Builders

Tell us about the land, the pad, the road or the building and where it sits. Call or text (214) 557-5106, or send the form and we will get back to you with the next step.

  • Call or text (214) 557-5106
  • Serving Fort Worth, TX and DFW, West Texas and the Hill Country
  • Written quotes · dirt work, commercial finish outs and custom homes

Request a Quote

Tell us about the land or the building project and where it is. We look at the job and put the quote in writing.

Call (214) 557-5106