Tenant Finish Out
We finish out retail and commercial spaces as one job: roofing, HVAC, polished concrete, drywall, insulation, doors, cabinets and countertops. One company manages every trade from the bare shell to the finished space.
Learn More
In Keller, the city's code says no grading or tree removal takes place on undeveloped land without a tree removal permit, unless the code exempts it. Dirt work in Keller starts with that rule and the trees it protects. Big Bear Creek crosses the city, and FEMA maps flood zones along it. A pad or a drive here has to fit the trees, the creek and the ground.
Bankston's Builders does heavy-equipment dirt work across the Dallas-Fort Worth area, and Keller is part of our service area. Here we clear wooded lots and acreage, then cut and compact building pads for custom homes and commercial buildings. We look at the job and put the quote in writing, so call or text (214) 557-5106.
Tell us about the land or the building project and where it is. We look at the job and put the quote in writing.
Keller sits on the western fringe of the Eastern Cross Timbers, in northeast Tarrant County. The first settlers came in the mid-1840s and homesteaded near the headwaters of Big Bear Creek. Today Big Bear Creek, Little Bear Creek and Marshall Branch all cross the city.
The NRCS soil survey of Tarrant County maps mostly sandy soils across Keller. Crosstell and Gasil fine sandy loams lead the map. Silstid loamy fine sand and Rader fine sandy loam show up too. Wilson clay loam and Navo clay loam cover other parts of the city.
Sand and clay loam act differently under a slab, so the soil report for each lot sets the pad design. We cut and fill to the engineer's grades, then compact the pad in lifts. Our land grading shapes the lot so water runs away from the slab.
Keller's Unified Development Code prohibits the clear-cutting of land. A tree removal permit comes before grading or tree removal on undeveloped property, unless the code exempts the work. For a new house, that permit can come with the building permit or as a separate permit.
On a house lot, the building pad, the driveway and the public sidewalk on the approved plan may be cleared. Another 20 percent of the remaining quality trees may come out for other construction. Past that, the code calls for replacement trees that equal or exceed the diameter of each tree removed.
Heavy equipment has its own rules near a protected tree. Grade changes and equipment traffic stay out of its critical root zone, with a few exceptions. A protected tree counts as preserved only if at least 75 percent of that root zone stays at natural grade.
Where a protected tree sits within 20 feet of the work, 4-foot protective fencing goes up first. That fencing goes in before major heavy-equipment work on utilities and roadways begins. Our land clearing follows the approved tree plan and stays outside the fenced root zones.
Keller wants an approved Final Plat filed before it issues a building permit. That rule covers tracts that match Tarrant Appraisal District records but were never formally platted. The Community Development Department can tell you whether a property is platted.
A grading permit from Public Works asks for an erosion control plan and a stamped engineered grading plan. It also asks for a tree survey and preservation plan. Before a development application, the city's Development Review Committee meets applicants weekly, by appointment. Applicants bring a concept plan that shows the full site.
A drive onto US 377, Keller Parkway (FM 1709) or Davis Boulevard (FM 1938) needs a TxDOT permit before it is built. Texas law also wants a Texas 811 request at least 48 hours before digging, not counting weekends and legal holidays. Our private drives and utility trenching follow the approved plans and the marked lines.
The 2010 Census counted 39,627 people in Keller, and the 2020 count was 45,776. By the Census Bureau's survey estimates, the median Keller home was built in 1999. Of the city's 16,892 housing units, 4,944 went up from 2000 to 2009. Another 2,887 went up from 2010 to 2019, and 247 in 2020 or later.
By those counts, about 8 in 10 Keller homes were built before 2010. So a new building site here is often an older lot or a tract between streets and drainage already in place. Each one still needs a level pad, a drive and a plan for the water.
FEMA's flood maps show 100-year flood zones and a regulatory floodway inside Keller. Most of the flood study's cross sections there sit on Big Bear Creek and its tributaries, and Little Bear Creek is studied too. On a lot near those creeks, our site drainage work builds the swales and slopes the drainage plan calls for.
For select clients, Bankston's Builders carries the job from the pad through custom home construction.
Communities and areas we serve around Keller: Keller Town Center, Bear Creek Parkway, Big Bear Creek, Little Bear Creek, Marshall Branch, US 377, Keller Parkway (FM 1709), Davis Boulevard (FM 1938), Southlake, North Richland Hills, Watauga, Roanoke.
Keller ZIP codes served: 76248, 76262.
Keller is part of our service area. We look at the job and put the quote in writing.
(214) 557-5106
We finish out retail and commercial spaces as one job: roofing, HVAC, polished concrete, drywall, insulation, doors, cabinets and countertops. One company manages every trade from the bare shell to the finished space.
Learn More
We build ground-up commercial buildings and additions for owners and developers. One company carries the job from the dirt work and the pad to the finished building.
Learn More
We clear trees and brush off ranch land and building sites with heavy equipment, roots and all. The ground is left ready for the pad or road that comes next.
Learn More
Building pads for commercial buildings, data centers, oilfield locations and custom homes. We cut and fill to the plan grades and compact each pad in lifts.
Learn More
Land grading levels lots and tracts and shapes the ground so water runs off. We do rough grading and finish grading with heavy equipment for developers, ranch owners and oil and gas operators.
Learn More
We build private, ranch, lease and haul roads on a compacted base with a gravel or caliche surface. Ditches and culverts move water off and under the road.
Learn More
As part of the site work, we dig trenches for water lines and electrical conduit, then backfill and compact them. A licensed plumber or a licensed electrician makes the hookups.
Learn More
We cut ditches and swales and set culverts that carry storm water off pads and roads. We also build stock tanks, ponds, dams and detention basins with heavy equipment.
Learn More
We build caliche pad sites and lease roads for oil and gas operators in West Texas and the Permian Basin. Grading and drainage around the location are part of the job, done by crews with real expertise on heavy equipment.
Learn More
Site work for data center campuses: clearing, mass grading, building pads, access roads, conduit trenches and drainage. We build the ground the data halls stand on, to the plans and the geotechnical report.
Learn More
We pour concrete slabs and pads on the sites we prepare ourselves. Inside commercial finish outs, we polish the concrete floor.
Learn More
We build poured concrete retaining walls that hold a cut or a fill on commercial sites, pads and ranch land. The excavation, footing, drainage and compacted backfill come with the wall.
Learn More
We rebuild commercial buildings and homes after a fire or a flood, once the building is dried out. The work runs to the insurance scope, from the tear-out through roofing, re-piping, drywall and finishes.
Learn More
We renovate existing commercial buildings for owners and landlords: shopping and strip centers, office buildings, warehouses and shops. The work covers the exterior, the interior, tired building systems and the site around the building.
Learn More
We run Ethernet and structured cabling and install AV systems inside the commercial spaces we finish out. On data center projects, we put together the server racks and run the network cabling to them.
Learn More
High-end custom homes for select clients, from the pad to the finished house: stonework, custom iron doors, stone arches, fireplaces, custom kitchens, baths and closets. The dirt work and the build stay with one company.
Learn MoreA few of the questions we hear most around Keller. If yours is not here, call or text and ask.
Tell us about the land, the pad, the road or the building and where it sits. Call or text (214) 557-5106, or send the form and we will get back to you with the next step.
Tell us about the land or the building project and where it is. We look at the job and put the quote in writing.